
Concord, Middlesex County
Kitchen remodeling in Concord, MA
Step 1 of 6
What do you want done in your kitchen?
Pick the closest one.
Concord's antique and mostly pre-1978 houses bring their own rules. Tell us what you want to change and we'll price it, free.
- Free estimates
- Full remodels and islands
- Cabinets, counters, tile
Kitchen layers for a Concord house, from floor to faucet
Each layer has its own page. Start with the one you are weighing.

Kitchen layout concord ma
Antique houses often have closed-off kitchens. Taking out a wall can be structural work, so plan it before you pick finishes. Full remodels include layout changes and islands.
Kitchen layout changes
Cabinet installation Concord MA
New cabinets usually take 8 to 14 weeks to arrive, and the rest of the job follows them. Order first, then set the calendar.
Kitchen cabinet installation
Granite countertops Concord MA
Granite or quartz is usually the first question once the cabinets are sound. We replace countertops to suit the kitchen you have.
Kitchen remodeling
Tile backsplash Concord MA
The wall behind the stove shows years of cooking. A new tile backsplash and floor make the room look as new as it is.
Kitchen remodeling
What an older Concord house changes about the job
Housing in Concord is mostly pre-1978, with antique homes in the village and in West Concord. That shapes the work in three ways.
- Lead-safe rules. Federal and Massachusetts rules apply to paid work in pre-1978 housing once a job disturbs more than 6 square feet of painted surface in a room. Contractors need a Lead-Safe Renovation Contractor licence. We will say plainly what applies to your kitchen at the estimate.
- Structure. Removing a wall between kitchen and dining room is structural work. Read about kitchen layout changes.
- Permits and review. Ask the town's building department which of your jobs need a permit, and whether your street sits in a historic district, since that can affect the schedule. Concord is also in the state's fossil-fuel-free building pilot, so check before adding gas lines.
Old vinyl floor tile can contain asbestos. Testing comes before anything comes up.
Cost to remodel a kitchen in Concord, MA
Published Massachusetts ranges, not a quote. Your free estimate turns a range into a number.
| Scope | Typical range | Typical time on site |
|---|---|---|
| Refresh | $25,000 to $45,000 | 3 to 5 weeks |
| Mid-range | $50,000 to $85,000 | 6 to 9 weeks |
| Full gut, new layout | $90,000 to $175,000 and up | Longer, by scope |
Samples, estimate, install
How a Concord kitchen runs, in order.
Tell us about your kitchen
Send your town and what you want to change, from a sink to a new layout.
Get your free estimate
We price the work you want at no cost to you.
Choose what goes in
You decide on cabinets, countertops, tile, sink and fixtures, and whether the layout changes.
We remodel the kitchen
We carry out the remodel you chose.
Start cooking
Sink, faucet and fixtures go in and the kitchen is yours again.
Questions from Concord homeowners
Does kitchen remodeling in a pre-1978 Concord MA home need a lead-safe contractor?
Usually yes. Concord is mostly pre-1978 housing, and lead rules apply to paid work that disturbs more than 6 square feet of painted surface in a room. Massachusetts contractors need a Lead-Safe Renovation Contractor licence.
Do I need a permit for kitchen remodeling in Concord, MA?
Layout changes, wall removal, plumbing and electrical work generally involve permits. Confirm with the town's building department. Homeowners who pull their own permit give up rights under the home improvement contractor law.
What is the cost to remodel a kitchen in Concord?
Published Massachusetts ranges run about $25,000 to $45,000 for a refresh, $50,000 to $85,000 mid-range, and $90,000 to $175,000 and up for a full gut. These are guides, not quotes.
What is cheaper, quartz or granite countertops?
Prices overlap and vary by slab and edge. Your free estimate can price both for your kitchen so you can compare.
Can a homeowner do plumbing work without a licence?
Massachusetts requires a licensed plumber for plumbing and a licensed electrician for electrical work, even in your own home. Check the rules with the building department.
How long do cabinets take?
About 8 to 14 weeks. For a kitchen finished by the holidays, start in spring or early summer.
Request my free estimate in Concord
Your town, what you want to change and any photos you have. We'll come back to you with a free estimate.
- You send the form
- We review your kitchen details
- You get your free estimate
Step 1 of 6
What do you want done in your kitchen?
Pick the closest one.

